
Another school has reopened in Ukraine following reconstruction works conducted with EU support.
The ‘Brave to rebuild’ team, supported by the EU-funded ‘U-LEAD with Europe’ programme, managed the project to repair Lyceum No. 11 in Izyum.
“Of the ten schools in the city, five were completely destroyed, and another five suffered significant damage,” says a Facebook post by the EU Delegation to Ukraine. “Despite heavy losses and difficulties during the occupation, Izyum Lyceum No. 11 managed to survive and reopen its doors.”
The stairs to the basement and the classroom located there, where it is safe to study during an air raid, have been renovated. A new electrical system with sockets, switches, lights and ventilation system was also installed. The Lyceum also installed two bathrooms (toilets, sinks and boiler) and a new sewerage and water system. The entrance and the area in front of the lyceum have also been repaired.
In addition, a Ukrainian charitable foundation, SavED, will soon set up a digital learning centre called ‘Beehive’ in the renovated basement, where it will install equipment, furniture, appliances and provide educational literature.
By December, 742 students, including 377 forced IDPs, will be able to study here safely and with modern technology.
Find out more
News
-
EU4PFM: як ЄС допомагає реформувати управління державними фінансами України
-
EU supports development of training centres for the Armed Forces of Ukraine
-
The EU Ambassador to Ukraine, Katarina Maternová, discussed with teachers from Kyiv how to bring the EU closer to young people in Ukraine
-
Poltava Polytechnic has opened Building “F”, renovated with EU support: the renovation cost nearly €1.76 million
-
The EU and France have allocated €4.5 million for the reform of state asset management in Ukraine
-
With EU and Polish support: a modern Psychosocial Support Centre has opened in Bilhorod-Dnistrovskyi